Concrete Calculator

Work out how much concrete a slab, footing, set of post holes, column or flight of stairs needs, in cubic yards and in bags of each size, then plan the rest of the pour: the gravel base, the form boards and stakes, the rebar or wire mesh, and a ready-mix order you can print.

Units
NRMCA: order 4 to 10% over the plan for waste and uneven ground

What you are pouring

Add a row for each slab, footing, set of post holes, column or flight of stairs.

  1. Element 1: Patio slab
  2. Element 2: Deck footings
    Side of a square post (a 4x4 is 3 1/2 in or 8.9 cm); blank for none
  3. Element 3: Back steps

Gravel base

Compacted stone under the slabs. Footings are left out: your plan or code says what they bear on.

4 in under walks and patios; 6 to 12 in under a driveway
Quikrete tamps 5 in of gravel to 4: 25% more

Forms

Boards on edge around each slab, staked on the outside.

Shorter than the slab: dig the ground inside below them. County Materials digs 1/2 in below 2x4s for a 4 in slab.
Quikrete: every 3 ft

Reinforcement

Steel holds cracks tight; it does not stop them, and it does not make a slab structural. Your plan or code sets the steel in footings.

Centre to centre, both ways
ACI 302.1R: steel to within 2 in of the edge
Blank: the IRC lap, 20 in at Grade 40 or 30 in at Grade 60
Apart each way; 4 ft per CRSI practice

Prices (optional)

Enter what your store and your ready-mix supplier charge to compare bags with the truck.

Typical $6.15–$6.47 per bag (Oct 2026), varies by region
Typical $119–$147 per cubic yard (Jan 2026), varies by region
Smaller orders are billed as this much. Blank: 2 yd³, as two of three suppliers billed in one county’s bids; 0 for none
Delivery and any short-load charge
Typical $24–$34 per ton (Dec 2025), varies by region
Ask your lumber yard
Typical $10.20–$14.96 a 20 ft bar (Oct 2026), varies by region

Concrete pour plan

Concrete to buy

2.73 yd³ of concrete

Mix it yourself from 123 bags of 80 lb, or order 2.75 cubic yards of ready-mix.

Includes 10% extra. Ready-mix is ordered in quarter yards.

Cubic yards
2.732.09 m³
Cubic feet
73.767 before the extra
Ready-mix order
2.75 yd³rounded up to ¼ yard
Weight in place
5.16 tons4.68 t, 10,313 lb
Premixed bags (any one size)
Bag sizeBags
40 lb bag (0.30 cu ft)246
50 lb bag (0.375 cu ft)197
60 lb bag (0.45 cu ft)164
80 lb bag (0.60 cu ft)123
90 lb bag (0.67 cu ft)110

Bags or a truck

Ready-mix order
2.75 yd³quarter-yard steps
80 lb bags
1239,840 lb to lift

Under 6 yd³, expect a short-load charge: in one county’s 2020 bids every supplier added one below 5 to 6 yd³, and two of the three billed at least 2 yd³ however little was ordered. Ask your supplier for its minimum and its charge for your load, and enter them under Minimum billing and Truck fees.

At typical prices on file, a yard in 80 lb bags costs $277 to $291 against $119 to $147 for a yard of ready-mix in a full load, before fees, so the minimum billing and the truck’s fees decide it. Enter your prices to see where it turns.

Shopping list

  • Concrete

    123 bags of 80 lb 10% extra included

    or 2.75 yd³ of ready-mix

  • Gravel base

    1.85 yd³ (2.58 tons) 4 in compacted under 120 sq ft of slab

    or 100 bags of 0.5 cu ft

  • 2x6 form boards, 8 ft

    8 5 1/2 in tall

  • Form stakes

    24 Every 3 ft, both sides of each corner and behind each joint

  • 2 1/2 in deck screws or duplex nails

    48 Two per stake for each board it holds

    plus 8 of 3 in for the corners

  • #4 rebar, Grade 60, 20 ft bars

    13 17 bars cut from them, 180 ft in place

  • Rebar chairs (with sand plates on soil)

    25 No more than 4 ft apart

Forms are counted for slabs (and footings, when ticked). Stairs and columns need their own forms or tubes.

Ready-mix order sheet

Volume
2.75 cubic yards (2.1 m³)
Includes
10% extra over 2.48 yd³ measured
For
Patio slab: 12 ft × 10 ft, 4 in thick; Deck footings: ⌀ 12 in × 36 in deep; Back steps: 4 ft wide, 7 in rise, 11 in run
Strength (psi)
to fill in
Slump (in)
to fill in
Air entrainment (%)
to fill in
Largest stone size
to fill in
Delivery address
to fill in
Date and time
to fill in
Placement (chute, wheelbarrow or pump)
to fill in
Contact phone
to fill in

The IRC (Table R402.2) asks at least 3,000 psi where weathering is moderate and 3,500 psi where it is severe, air-entrained 5 to 7%, for garage floors, porches and steps out in the weather. Your supplier knows the mix your area uses.

Your pours, to scale

12 ft10 ft
Patio slab: 12 ft × 10 ft, 4 in thick
⌀ 12 in36 in deep
Deck footings: ⌀ 12 in × 36 in deep (6 of them)
7 in3 × 11 in
Back steps: 4 ft wide, 7 in rise, 11 in run
Element by element, before the extra
ElementCountVolume
Patio slabSlab: 12 ft × 10 ft, 4 in thick140 cu ft
Deck footingsPost holes: ⌀ 12 in × 36 in deep614.1 cu ft
Back stepsStairs: 4 ft wide, 7 in rise, 11 in run3 steps12.8 cu ft
Total67 cu ft
With 10% extra73.7 cu ft
Forms and steel by element
ElementEdge formedBoardsStakesSteel
Patio slab44 ft82417 bars, 13 to buy

Print for a checklist to take to the store, with the order sheet for the supplier’s call: the inputs are left off.

How to use it

  1. Add each element. A slab (rectangle, circle, triangle, ring or a known area, with its thickness), a footing (length, width, depth and how many), post holes (diameter, depth, how many, and the post size so its volume is subtracted), round columns or stairs.
  2. Use real thicknesses. Measure from the compacted base to the top of the forms. A slab on 2 x 4 forms is 3 1/2 in thick unless the ground inside is dug lower. For post holes, measure the hole you will dig.
  3. Set the extra. The National Ready Mixed Concrete Association recommends ordering 4 to 10 percent more than the plan dimensions for waste, over-excavation and form bulge; the calculator starts at 10. An extra 1/8 in on a 4 in slab alone is 3 percent more concrete.
  4. Plan the base, forms and steel. Tick what your job needs. Every default comes from a source on this page, and you can change each one to match your plan: a different base depth, board length, bar size, grid spacing or mesh.
  5. Price it and print. Enter bag and ready-mix prices and the truck's fees to see which is cheaper. Print gives a shopping list with a box to tick for each item and an order sheet for the supplier's call.

Slab sizes at a glance

Common slab sizes at 4, 5 and 6 in thick, each worked out by the calculator with 10 percent extra. The yards are what you need; a ready-mix supplier rounds the order up to the next quarter yard.

Concrete for common slabs, with 10 percent extra
Slab4 in thick5 in thick6 in thick
Cu yd60 lb bags80 lb bagsCu yd60 lb bags80 lb bagsCu yd60 lb bags80 lb bags
4 x 4 ft0.2214100.2717130.332015
4 x 8 ft0.4327200.5433250.654030
8 x 8 ft0.8753401.0966491.307959
10 x 10 ft1.3682621.70102772.0412392
10 x 12 ft1.6398742.04123922.44147110
12 x 12 ft1.96118882.441471102.93176132
12 x 16 ft2.611571183.261961473.91235176
16 x 16 ft3.482091574.352611965.21313235
20 x 20 ft5.433262456.794083068.15489367
24 x 24 ft7.824703529.7858744011.7704528

Bags are whole bags of any one size. Above about a yard the bag counts get long; the break-even below shows where the truck takes over.

Bag yields

A bag of concrete mix is sold by weight, but what you need to know is how much space the mixed concrete fills. The calculator uses the yields the maker publishes rather than a rule of thumb:

Premixed concrete bag yields and bags per volume
BagYield (cu ft)Bags per cu ydBags for a 10 x 10 ft slab, 4 in
40 lb bag (0.30 cu ft)0.30090.0112
50 lb bag (0.375 cu ft)0.37572.089
60 lb bag (0.45 cu ft)0.45060.075
80 lb bag (0.60 cu ft)0.60045.056
90 lb bag (0.67 cu ft)0.67040.350

Yields assume the water content on the bag. Different products (fast-setting, high-strength, mortar mix) have their own yields; check the bag you are buying. The slab column has no waste allowance. The bags per cubic yard guide has the full chart.

Bags or ready-mix: the break-even

Bagged mix costs more per yard than ready-mix and you do all the mixing, but you can buy exactly what you need and pour in sections. Ready-mix arrives in one load, already mixed, and is cheaper per yard, but small loads carry fees. One cubic yard is 45 of the 80 lb bags, 3,600 lb to lift into the mixer and into the forms.

  • The order. Ready-mix is ordered in quarter yards, so the calculator rounds up to the next quarter. Never round down: a short pour means a cold joint or a second delivery.
  • Short loads. Small orders cost extra. In Jefferson County, Missouri's 2020 ready-mix bids, every supplier added a charge on loads under 5 to 6 cubic yards, and two of the three billed at least 2 yards however little was ordered, adding $100 and $125 for a 2 to 2 3/4 yard load. The calculator flags any order under 6 yards and bills a smaller order as the minimum (2 yards unless you enter your supplier's).
  • The arithmetic. With the typical prices on file ($6.15 to $6.47 per 80 lb bag as of October 2026; $119 to $147 per yard of ready-mix as of January 2026, a price for full 10-yard loads, before fees), a yard in bags costs $277 to $291. An order under the supplier's minimum is billed as the minimum, so up to 2 yards the truck costs the same however little you pour: with the 2 yard minimum and a $125 short-load charge (one bidder's charge for a 2 to 2 3/4 yard load), 2 yards cost $363 to $419, and bags cost less up to about 1.31 to 1.44 cubic yards. Above that the truck wins, by more with every yard.
  • The effort. Price is not the whole story: every bag is lifted twice and mixed, while the truck needs forms, base, steel, tools and helpers ready to place the whole load at once.

The calculator's order sheet carries the volume and leaves lines for what the supplier will ask: strength, slump, air entrainment, the largest stone, the address and the time. For garage floors, porches and steps exposed to the weather, the IRC (Table R402.2) asks at least 3,000 psi where weathering is moderate and 3,500 psi where it is severe, air-entrained 5 to 7 percent.

Slab thickness by use

Thickness and base by use
UseThicknessBaseWhere it comes from
Walkway or sidewalk4 in4 in compacted (5 in loose)Quikrete: sidewalks at least 4 in; its walkway guide tamps 5 in of compactible gravel to 4 in.
Patio, hot tub or grill pad4 in, more for heavy loads4 in compactedQuikrete: simple slabs are normally 4 to 6 in thick, depending on the load they bear. Follow a spa maker’s own pad spec where it gives one.
Shed or garage floor4 in (3 1/2 in minimum)4 in where the floor is below gradeIRC R506: floors on ground at least 3 1/2 in thick, on a 4 in base course where the slab is below grade. Table R402.2: 3,000 psi (moderate weathering) or 3,500 psi (severe) air-entrained concrete for garage floors.
Driveway, cars and light trucks4 in minimum6 to 12 in compactedCounty Materials: at least 4 in; going from 4 to 5 in adds about 20% to the concrete cost (25% more concrete) and almost 50% to the load it carries.
Driveway with heavy vehicles5 in or more6 to 12 in compactedCounty Materials: garbage trucks or other heavy vehicles may need 5 in or more. Anything heavier is an engineer’s call.

Thicker is stronger but costs in proportion: 5 in is 25 percent more concrete than 4 in. Footings and anything structural are sized by your plan or local code, not by this table.

The gravel base

The IRC asks for a 4 in base course of clean graded sand, gravel or crushed stone under a floor slab that is below grade (Section R506), and Quikrete's walkway guide spreads 5 in of compactible gravel and tamps it to 4. That is where the calculator's 4 in default and its 25 percent compaction allowance come from: you buy the loose volume, and it packs down to the depth you enter. For driveways, County Materials recommends 6 to 12 in of compacted gravel or crushed stone.

Under the 12 by 10 ft patio in the example that is 40 cubic feet compacted, 50 loose: 1.85 cubic yards, about 2.58 tons of crusher run / road base at its 103 lb per cubic foot, or 100 of the 0.5 cu ft bags. The gravel calculator covers other stones and depths.

Forms, stakes and screws

Form boards are 2x lumber on edge, and a 2x is smaller than its name: a 2 x 4 is 3 1/2 in tall, a 2 x 6 5 1/2, a 2 x 8 7 1/4, a 2 x 10 9 1/4 and a 2 x 12 11 1/4 (American Wood Council, from the lumber standard PS 20). Left on its own, the calculator picks the smallest board at least as tall as the pour, so a 4 in slab gets 2 x 6s, and stacks boards for anything deeper than 11 1/4 in. County Materials describes the other way: 2 x 4 forms with the ground inside dug at least 1/2 in below the bottom of the form for a 4 in slab; Quikrete's walkway guide also builds its forms from 2 x 4s set on edge. Choose a board under Slab form boards and the calculator counts that board and tells you how far to dig.

  • Boards. Each side is cut from whole boards butted end to end; the long sides run 1 1/2 in past each corner to cover the ends of the short ones. Offcuts are not reused between sides, so the count errs high.
  • Stakes. Quikrete drives 2 x 4 stakes every 3 ft and at both sides of every corner; the calculator adds one behind each butt joint.
  • Screws or nails. Quikrete fastens stakes with 2 1/2 in deck screws and the corners with 3 in screws, and suggests double-headed (duplex) nails for forms that come off easily. The count assumes two per stake for each board row and two per row at each corner.
  • Curves. Round slabs and rings are formed with a bendable strip; Quikrete names 1/4 in hardboard, kerfed lumber or sheet metal. The calculator gives the length and how tall it must be.

Rebar or wire mesh

Steel in a slab on the ground is there to keep the cracks that do form tight. ACI 302.1R, the American Concrete Institute's guide to floor and slab construction, is plain that reinforcement does not prevent cracking, and nothing about steel makes a slab structural. County Materials calls steel optional in a driveway; Quikrete suggests wire mesh for a sidewalk or small slab made with its standard mix and sells a fiber-reinforced mix that does without it. Footings are a different matter: their steel comes from your plan or the code, such as the IRC's one No. 4 bar at the top and bottom of a turned-down footing in high seismic areas.

  • Where it goes. The IRC holds slab steel between the middle and the upper third of the slab (Section R506); ACI 302.1R reports the Wire Reinforcement Institute's advice for welded wire, 2 in below the surface or within the upper third, whichever is closer to the top. Steel lying on the ground does almost nothing, and ACI says welded wire should never be laid down and pulled up into the wet concrete.
  • Chairs. ACI 302.1R names chairs with sand plates, or precast concrete blocks, as the most effective supports on soil. The calculator spaces bar chairs no more than 4 ft apart each way (the Kansas DOT bar-support standard, from the Concrete Reinforcing Steel Institute's practice) and mesh supports no more than 12 in apart, as ACI 301 asks for wire as light as 6 x 6 W1.4.
  • Edges and laps. ACI 302.1R brings the steel to within 2 in of the slab edge; footing bars stop 3 in from the ends, the IRC's cover for concrete cast against earth. Where bars are spliced, the IRC's lap table gives a No. 4 bar 20 in at 40,000 psi yield, which is 40 bar diameters, and 30 in (60 diameters) at 60,000 psi. The calculator laps by the bar grade you choose and starts at Grade 60, the longer lap; the table starts at No. 4, so a #3 bar is given the No. 4 lap. Welded wire laps one wire spacing plus 2 in, 8 in for 6 x 6 mesh, under ACI 318; the American Society of Concrete Contractors notes that a one-square lap is often accepted in slabs on the ground.
  • Joints still do the work. Steel does not replace control joints. Quikrete spaces them at 2.5 times the slab thickness in inches, in feet (10 ft for a 4 in slab), at least a quarter of the slab deep; County Materials says no more than 10 ft apart in a driveway, in square panels.

In the example patio, #4 bars at 18 in with 2 in of edge cover come to 17 bars cut from 13 sticks 20 ft long, 180 ft in place, on 25 chairs. The same slab in welded wire takes 3 sheets of 5 x 10 ft mesh lapped 8 in.

Footings, permits and when to call an engineer

The calculator counts materials for the layout you give it. It does not check that a slab, a footing or its steel is strong enough, and it cannot: that depends on the soil, the load and the climate.

  • Footings for a building are set by the IRC (Section R403): at least 12 in wide and 6 in thick, at least 12 in below undisturbed ground and below the local frost line, with the size from the soil and the load. Use the dimensions on your plan or permit.
  • Permits. The IRC's list of work that needs no building permit (Section R105.2) includes sidewalks and driveways, and retaining walls up to 4 ft from the bottom of the footing that hold back no extra load. Check anything else, such as a footing or a garage slab, with your building department: it keeps the local list and any amendments.
  • Call an engineer for slabs that will carry heavier vehicles than a driveway's, for clay or expansive soil (which County Materials says may have to be dug out and replaced), for any slab that spans rather than sits on the ground, and for retaining walls over 4 ft. The retaining wall calculator covers walls.

Post holes

Many people put 4 to 6 in of gravel in the bottom of a post hole for drainage and set the post on it, which shortens the concrete column: enter the concrete depth, not the hole depth. The calculator subtracts the post's own volume, which matters: in a 12 in hole a 3 1/2 in post is about a tenth of the volume.

Worked example: a patio and six pergola posts

A 12 by 10 ft patio slab 4 in thick, plus six post holes 12 in across and 30 in deep for 4 x 4 pergola posts, with 10 percent extra and the calculator's defaults for the base, forms and steel:

Result

ElementCountCubic feet
Patio slab140.00
Pergola post holes610.50
  • Concrete93 bags of 80 lb
  • Gravel base1.85 yd³ (2.58 tons)
  • 2x6 form boards, 8 ft8
  • Form stakes24
  • 2 1/2 in deck screws or duplex nails48
  • #4 rebar, Grade 60, 20 ft bars13
  • Rebar chairs (with sand plates on soil)25

The slab is 40.0 cubic feet and the six holes add 10.5 once the posts are subtracted. With the allowance that is 55.6 cubic feet or 2.06 cubic yards, which is 93 of the 80 lb bags or 124 of the 60 lb bags, and a ready-mix supplier would bill 2.25 yards, a short load. Under the slab go 1.85 cubic yards of base; around it 8 boards of 2x6 on 24 stakes; in it 13 sticks of #4 bar. Many people would set the posts from bags one weekend and order the slab's concrete for the next.

Mistakes people make

  • Calling a 2 x 4 form a 4 in slab. It is 3 1/2 in. Use a 2 x 6, dig the inside lower, or enter 3.5.
  • Skipping the waste allowance. Running out mid-pour means a cold joint or a frantic trip for bags. NRMCA says 4 to 10 percent.
  • Rounding ready-mix down. Suppliers bill by the quarter yard and will not come back with a quarter yard for free.
  • Buying the base by its compacted depth. Gravel packs down; 4 in compacted starts as about 5 in loose.
  • Laying steel on the ground. Mesh or bars at the bottom of the slab do almost nothing. Set them on chairs.
  • Too much water. A sloppy mix pours easily and cracks early. Follow the water on the bag; the yields assume it.
  • Forgetting the post displaces concrete. Count the hole minus the post, which the calculator does.

Sources

Frequently asked questions

How much concrete do I need for a slab?

Multiply length by width by thickness in feet and divide by 27 for cubic yards, then add 4 to 10 percent, the allowance the National Ready Mixed Concrete Association recommends for waste and an uneven subgrade. A 12 by 12 ft slab 4 in thick is 48 cubic feet; with 10 percent extra that is 1.96 cubic yards, an order of 2.00 yards, or 118 of the 60 lb bags or 88 of the 80 lb bags. The chart above has the common sizes.

How many 80 lb bags of concrete make a cubic yard?

An 80 lb bag yields 0.60 cubic feet, so 45 bags make a cubic yard (27 cubic feet). 90 of the 40 lb bags, 72 of the 50 lb bags, 60 of the 60 lb bags, 41 of the 90 lb bags do the same. That is 3,600 lb of bags to carry and mix for one yard, which is the real argument for ready-mix on larger pours.

How many bags of concrete for a 10 x 10 slab?

At 4 in thick a 10 by 10 ft slab is 33.3 cubic feet, 1.23 cubic yards. Without any waste allowance that is 75 of the 60 lb bags or 56 of the 80 lb bags; add 10 percent for an uneven subgrade and you are at 82 of the 60 lb bags or 62 of the 80 lb bags. A ready-mix supplier would bill 1.50 yards.

How thick should a patio, driveway or shed slab be?

Quikrete puts sidewalks at 4 in or more and small slabs at 4 to 6 in, depending on the load. The IRC sets 3 1/2 in as the minimum for a floor on the ground, such as a garage or shed floor. For driveways, County Materials recommends at least 4 in for cars and light trucks and 5 in or more where garbage trucks or other heavy vehicles will drive. A slab screeded to the top of 2 x 4 forms is only 3 1/2 in thick, so enter the real thickness.

How much gravel do I need under a concrete slab?

A 4 in compacted layer is the usual answer: it is the base course the IRC asks for under a floor that is below grade, and Quikrete's walkway guide spreads 5 in of compactible gravel and tamps it to 4. Buy the loose volume, 25 percent more than the compacted one: under a 12 by 10 ft patio that is 1.85 cubic yards, about 2.58 tons of crusher run. Driveways take more: County Materials recommends 6 to 12 in.

Do I need rebar or wire mesh in a concrete slab?

Not always. Steel in a slab on the ground keeps cracks tight; it does not stop them, and ACI 302.1R says as much. County Materials calls steel optional in a driveway. If you use it, hold it between the middle and the upper third of the slab on chairs (the IRC's rule), never on the ground. Footings are different: their steel comes from your plan or the code.

How many stakes and form boards do I need?

Quikrete stakes forms every 3 ft, with a stake on both sides of every corner. For a 12 by 10 ft slab 4 in thick that comes to 8 boards of 2x6, 8 ft long, and 24 stakes, counting one behind each butt joint. The 2x6 is because a 2x4 is only 3 1/2 in tall; choose 2x4 under Slab form boards and the calculator counts those instead and tells you to dig the ground inside 1/2 in below them, as County Materials describes.

What is a short load of concrete?

A load smaller than the supplier's minimum, which costs extra. In Jefferson County, Missouri's 2020 ready-mix bids, every supplier charged extra on loads under 5 to 6 cubic yards, and two of the three billed at least 2 yards however little was ordered, plus $100 or $125 for a 2 to 2 3/4 yard load. Ask your supplier for its minimum and its charge before you compare it with bags.

When is ready-mix cheaper than bags?

A yard in 80 lb bags costs $277 to $291 at the bag prices on file, against $119 to $147 for a yard of ready-mix in a full load, before fees. A small order is billed as the supplier's minimum, often 2 yards, plus a short-load charge, so the truck costs the same for any pour up to the minimum. With a 2 yard minimum and a $125 charge, bags cost less up to about 1.31 to 1.44 cubic yards. Enter your prices and the calculator works it out.

How much concrete does a fence post need?

It depends on the hole, not the post: the volume of the cylinder minus the post inside it. A 12 in hole 30 in deep around a 4 x 4 post (3 1/2 in actual) holds 1.75 cubic feet. The fence calculator counts the holes and the bags for a whole fence.

Can I pour a slab in sections with bags?

Yes, and for a one-person job it is sensible: form the slab, mix and pour one section at a time to a joint, and finish each section before the next. Enter each section as its own element to see the bags per section.

Related